e.g. Construction of a filling station for a test-bench
For the final function tests the operator of a gear box test bench has to fill and refill the test objects with different oils.
We designed an extensive concept consisting of double hull tanks, a central pump station including filtration, interfaces for filling and refilling and complete piping. Our benefits are
engineering, complete construction and startup of the system.